Top 5 Red Flag Warnings about Septic System Design Engineers

Saturday, February 5th, 2011

Generic Viagra generic viagra mycoxafloppin

Here are the Top 5 warnings why you should not hire an engineer to design your septic system:

#1. He will beat any other engineer’s price by $100.00!

#2. He has a contractor that will give you a combined price for the  engineering and construction and furthermore, that contractor will beat anybody’s price!

#3. He can do the job cheaper than any other engineer because he has worked in your neighborhood before!

#4. He gives you a very simple keyword outline fee proposal that does not actually describe the engineering services to be performed!

#5. His fee proposal is only for the septic system design and does not include the fees for work that he has to perform during construction!

Your septic system is having problems or it has failed. You have been told that you need to hire an engineer to design a new septic system.

international-symbol-label-sym6-a-smIf during this hiring process you hear any of these Top 5 reasons, consider it to be a Red Flag Warning!

You are about to be fooled into spending more money than necessary and adding a considerable amount of aggravation to an already stressful problem.

Red Flag Warnings?

#1. He will beat any other engineer’s price by $100.00!

Isn’t that great? You do not have to do any further searching for an engineer. You don’t need to know about his qualifications or what services are to be performed by him, because this guy is saving you money (well at least $100.00). Engineering design services are not like buying a bag of cement at Home Depot. The fee for engineering design services is based on the amount of time being used and the staff that is performing these services. How can he guarantee that his fee will be lower? What is he not doing? Maybe he is not doing a design that is best suited for your property? Maybe he is using his standard design regardless of the construction cost?

#2. He has a contractor that will give you a combined price for the  engineering and construction and furthermore, that contractor will beat anybody’s price!

They must be psychic! The size of the leaching system is based on the results of the percolation test and the number of bedrooms in the house. The amount of excavation depends on the depth of the “good” soil (determined by the deep hole soil evaluation) and how much sand (if any) needs to be brought in to construct the system. The groundwater also causes an impact on the elevation of the system and the high groundwater could add a pump chamber to the system design.  How can a contractor know how much the construction will cost without actually having the holes dug and the design plan prepared? As for beating everybody’s price, what corners are being cut to do this?

Also, when its the contractor who hires the engineer, who does the engineer really work for? Not you! When it comes time during the construction of the system and the engineer has to go out to the site to observe the contractor’s work to confirm that it is properly built, does he represent you if something is wrong? If he is teamed up with the contractor, he is not going to mess-up his deal for future work with the contractor. Can you say, “Conflict of interest”?

#3. He can do the job cheaper than any other engineer because he has worked in your neighborhood before!

Knowing where you live does not really change the amount of work that the engineer needs to do in order to design the septic system. Does this sound like the gypsy work crews sealing driveways who are in your neighborhood and happen to have extra materials that they can sell you cheap, since the neighbor already paid for it? If he has records for your property lines, then this information will assist him in doing his work. He may have worked in your neighborhood, but did his previous plan have any problems with its approval? Check him out at the local Board of Health office and take a look at his work. Ask the neighbor about their experience with him and did he ask for extra fees once the project started.

#4. He gives you a very simple keyword outline fee proposal that does not actually describe the engineering services to be performed!

We don’t need no stinking paperwork!  You have to give him credit for trying, when the scope of his services just states, “Design septic system”! Well? This is what you want him to do, right? Will that design include the soil evaluation & percolation testing, existing conditions topographic survey and determination if wetlands issues will require other permits, location of your existing system and elevation of the pipe leaving your house, determination of the best technology to use at your property and possible local upgrade approvals to minimize impacts and construction costs? How about the testing fee and plan review fee that is typically paid to the Town? What about the cost of the excavating contractor to dig the percolation test hole and the deep holes for the soil evaluation?

If you hire this engineer, you can be assured one thing, that you will be told, “Oh, that was not part of my scope of work and it is an extra fee.”

#5. His fee proposal is only for the septic system design and does not include the fees for work that he has to perform during construction!

If you do get a defined scope of work, be sure it includes construction phase services. During the installation of the septic system the engineer (in Massachusetts) is required by the State Sanitary Code to make multiple site visits to view several stages of construction and to make measurements necessary to prepare a plan of the constructed system (this is called an “As-built” plan). When the system is elevated above the natural grade or additional filling is needed for Sanitary Code compliance, a topographic survey is performed after the system is back-filled /covered. This is called a “topographic  as-built” plan. The final as-built plan is submitted by the engineer to the Board of Health with a document that states his opinion that the system was constructed in accordance with the design plan and the permit issued by the Board of Health. This step is needed so you can get your Certificate of Compliance. There is a cost / fee associated with these construction phase services. If you do not have these construction phase items as part of your agreement, then you know you are going to pay more, especially if he cut his fee for the design phase.

international-symbol-label-sym18-a-sm But I need to hire a civil engineer to design my septic system.

What should I do?

The best advice to follow is to spend a little time and understand exactly what services your are buying and what costs are associated with those services. It is only human nature to want to follow the easier path (have someone else do the work for you). When it come to a septic system repair project, you could end up spending much more that was necessary. A little time spent now could mean larger savings for you in the future.

  • Be sure that the engineer has a good reputation and the quality of his work is also good. The local Board of Health is a good source of information, especially about engineers whose plans are always being returned for corrections and revisions before being approved.
  • The internet is a good research tool. If the engineer has a web page, review the information on septic system design.
  • When you call the engineer, do you get to speak with him and if you leave a message, does he promptly return your call?
  • Be sure to talk with the engineer to discuss your needs and project completion requirements. Ask him to send you a complete proposal. Don’t be intimidated if it takes several pages to describe the services. Take the time to read it and call the engineer back to ask your questions. Even visit his office to go over the scope of services and fees. This visit will also give you the opportunity to see the office.
  • Ask the engineer about other septic system projects that he has designed in your town.
  • Ask the engineer about his design approach. Does he design each system based on the individual property conditions or does he limit his designs to a few types of systems.

It you have any reservations about hiring a particular engineer, then don’t hire that engineer!

Before making calls and talking with an engineer about your project, you may want to get a better understanding about the process of replacing a failed septic system.

A straight forward description of this process is available free to download and it is called, “Valuable Information on Title 5 Septic System Perc. Testing, Soil Evaluation & Design Engineering.”

Do you have any other Red Flag Warnings to add to this Top 5 list?

You can comment and add them to this blog for all to see.