homelinksEmployment OpportunitiesContact
About UsBLOGLand DevelopersCommercial DevelopmentMunicipal ConsultingSeptic SystemsArchitectural Team ProjectsCase StudiesResource DirectoryFAQ

PMP Associates Blog

Spring is near! Time to repair the old Septic System

What a long cold winter! The snow is finally melting and I can actually see some lawns.

How do you know that Spring is near?   The Red Sox are in Ft. Myers?   The St. Patrick’s Day decorations are available in CVS & Walgreens? The pot-holes in the street in front of your house resemble the Grand Canyon?

I know that Spring is near when septic system contractors start constructing replacement septic systems. All those designs that were completed before the ice-age hit last December became “shovel ready” over Winter. Homeowners living with a failed septic system just want to get it fixed so the yard will be normal come Summer. The same applies for those people trying to sell their homes. They want to get the new septic system installed and the yard restored thereby eliminating last minute construction before the closing.

Checking the Excavation

Just this week construction started on one of our septic system repair design projects. The septic installer coordinated the construction with our office and the Board of Health to confirm that we would be available to perform the multiple construction phase tasks. For example, once the excavation is completed, the design engineer has to visit the construction site to observe and confirm that the unsuitable soils have been removed and that the excavated hole is ready to be backfilled with sand. The Health Agent also performs his own observations as the work progresses. The contractor had already installed the new 1,500 gallon septic tank and 1,000 gallon pump chamber in order to provide a temporary holding storage while the replacement system was being constructed.

Vented Distribution Box

Once the sand had been placed, the septic contractor installed the leaching chambers, distribution box and connecting pipes. Since this system will use gravity flow from the distribution box with a pump chamber to lift the septic tank effluent to the distribution box elevation, the distribution box and the chambers are designed with vent pipes. To help reduce the overall construction cost, our design used a chamber system that does not require any washed stone according to the State approval documents. The completed leaching area is also covered by a geotextile filter fabric. The State Sanitary Code requires the design engineer to observe this construction, make sufficient measurements to confirm that the components were properly installed and then prepare a plan showing the constructed system (This is called the “as-built” plan). The as-built plan is submitted to the Board of Health with a letter signed by the professional engineer, which states that the system has been installed in accordance with the approved plan.

Now that I have proof that Spring is near, what proof do you need?

How about some good news?  The cost of replacing a failed septic system is low. The slow down in construction has increased competition and reduced the costs. So now may be the best time to get that failed septic system replaced.

Is there bad news? Yes, be sure to investigate the qualifications and reputation of the “lowest price” contractor and carefully read the contract for items that are not included.

Tags: , , ,

10 Responses to “Spring is near! Time to repair the old Septic System”

  1. admin Says:

    “Saw this on LinkedIn, Mike. Thanks.”

  2. Lucio Laber Says:

    It is simple to see that you are informed about your writing. Cheers!

  3. I love this blog. Entertaining, Educating and Engrossing. Keep up the good work! The Septic Tank Man Says:

    I love this blog. Entertaining, Educating and Engrossing. Keep up the good work!

  4. sump pump reviews Says:

    Hi there! Would you mind if I share your blog with my facebook group? There’s a lot of people that I think would really appreciate your content. Please let me know. Many thanks

  5. sump pump Says:

    very good to learn, many thanks

  6. Davis Mcmillin Says:

    Heya i’m for the first time here. I came across this board and I find It truly helpful; it helped me out a lot. I hope to provide one thing again and help others such as you aided me.

  7. battery backup sump pump Says:

    that is pretty much all i needed, many thanks!

  8. sump pumps Says:

    i am in agreement. thanks a lot.

  9. cumming septic tank Says:

    i really need of this infomation , Regarding septic work experience we found so practile knowledge,thanks for this

  10. Septic Tank Emptying Hero Says:

    Good information and well written.